Peoria winters give backup power a real job. The city averages 24.6 inches of snow a year, with December and January the heaviest months, and in February 2011 Ameren Illinois planned for as many as 100,000 customers statewide to lose power ahead of a blizzard. A standby generator is what keeps the furnace and sump running through an outage like that. Hiring for it here involves more than the machine. Within the City of Peoria, a permit is required for adding to or changing electrical systems, and those permits come from Building Inspections, not Public Works. The city has adopted the 2017 National Electrical Code. Ameren Illinois also sets its own rules: it requires a visible open disconnect between its system and your generator, and the transfer arrangement must prevent the generator and the grid from being connected at once. Before you hire, ask who pulls the permit, whether the electrician is licensed where the work happens, and how the transfer switch and disconnect will meet Ameren's requirements.
Sources: Illinois State Climatologist (source, opens in a new tab), The Pantagraph (source, opens in a new tab)