Backup power in St. Catharines–Niagara

Electricians for generators and transfer switches.

10 pros in St. Catharines–Niagara

Niagara's case for backup power is recent. Niagara Region declared a state of emergency on Dec. 24, 2022 during a record-breaking winter storm, and Canadian Niagara Power reported 14,000 customers without power on Christmas Eve. Nine thousand six hundred were still out at 4 p.m. on Dec. 25. Wind gusts of 100 to 120 km per hour were expected along Lake Erie, and thousands of residents lost power. For a standby generator and transfer switch in St. Catharines, Welland, Niagara Falls or the towns around them, the hiring questions are practical. Ask who handles the electrical work and the inspection. Niagara Peninsula Energy says a micro generator of 12 kW or less that connects to its system needs an Electrical Safety Authority inspection once it is built. After the ESA issues its Connection Authorization, the utility schedules a site visit to witness-test the generator protections. Ask any installer to explain how that sequence fits into the quote and the schedule.

Source: CHCH News (source, opens in a new tab)

Not yet verified. We checked that each one’s own website offers this work, but we haven’t contacted them yet. How a business gets listed

Know a good one we’re missing? Suggest one

What to know in St. Catharines–Niagara

  • During the December 2022 storm, the Niagara Peninsula Conservation Authority issued a flood warning for the Lake Erie area, with wind gusts expected at 100 to 120 km per hour. Thousands of Niagara residents lost power.

    CBC News (source, opens in a new tab)

  • Niagara Peninsula Energy advises staying back 10 metres from a downed powerline and away from any trees in contact with a powerline. It notes that branches and trees may come down in storms and high winds and contact powerlines.

    Niagara Peninsula Energy (source, opens in a new tab)

Before you hire

  1. A generator wired into your home needs an approved transfer switch, fitted under a permit, so it can’t feed power back into the lines. Plan it before you buy.

    Source: bchydro.com (source, opens in a new tab)

  2. Get written quotes from at least three contractors for the same work, and check references from recent clients.

    Source: ised-isde.canada.ca (source, opens in a new tab)

  3. Put it in a written contract: the work, price, deposit, start and finish dates, warranty, permits and clean-up. Paying cash to skip it leaves you no recourse.

    Source: ised-isde.canada.ca (source, opens in a new tab)

Questions about hiring in St. Catharines–Niagara

What happens after a generator is installed in Niagara Peninsula Energy's area?

For a micro generator of 12 kW or less connecting to the utility's system, the owner must apply to the Electrical Safety Authority for an inspection once it is built. After the ESA issues its Connection Authorization, Niagara Peninsula Energy schedules a site visit to witness-test the generator protections. Niagara Peninsula Energy (source, opens in a new tab)

Why do Niagara homeowners look at standby power?

In December 2022 a record-breaking winter storm led Niagara Region to declare a state of emergency on Dec. 24. Canadian Niagara Power reported 14,000 customers without power on Christmas Eve, and 9,600 were still without it on the afternoon of Dec. 25. CHCH News (source, opens in a new tab)

What should a generator quote include?

Ask for the generator size, the transfer switch type, the wiring and fuel connection work, who applies for permits and the inspection, the schedule, the warranty and payment terms. A written quote that lists these items makes it easier to compare several installers on equal terms.

Who is allowed to install a standby generator and transfer switch?

The wiring and the transfer switch are electrical work, so ask to see the installer's electrical licence and who will pull the permit. Fuel connections may involve a separate qualified trade. Ask who is responsible for each part, and get that written into the contract.